婷婷伊人网,欧美日韩在线电影,在线观看日本中文字幕,精品视频一区二区三区四区,美女无圣光图片,国产欧美日韩va,欧美成人se01短视频在线看

 
?
    Online query

    In order to facilitate users to query the authenticity of products as quickly as possible, please pay attention to the official wechat of gbpsc 查詢

    Company news Current position: Site home- Company news

    Digger master must dig the ditch technique secret!

    2017-10-16 13:09:00View count:7334

    In excavator daily homework, digging groove homework is also big 

    excavator often do, is also the excavator driver "walk river's lake" 

    is one of the essential skills, the next, small make up the drivers 

    of heaven and earth, immediately with good talk about how to ditch 

    dug this topic.







    1. Understand the working conditions


    Before start, need to understand in detail the construction condition, 

    understand how to dig, what quality requirement, what it should be noted, 

    these common sense for the experienced driver may have a look, the in 

    the mind have a spectrum. Also for digging gutter, in advance, 

    communicate with the engineer to know which way is the ditch open? 

    Which side is the beginning? Which side is the end? Which side needs 

    a turn? How wide is dig? Dig deep? And so on and so forth.



    Find a reference

    Before digging ditches, often construction personnel have already 

    put away lime line, drivers and can clearly know the length and 

    width of groove and the scope of the working condition of the whole 

    sprinkled here good lime line is equivalent to a reference, when 

    mining straight hook according to lime line the route of the mining, 

    digging the front-end work device using the same trip as far as possible, 

    that is to say, each section of the groove digging big forearm and 

    bucket with the mining action as consistent as possible, to a certain 

    extent, can greatly improve the efficiency and the effect of construction. 

    It is best to stop the car to see if the ditch has deviated from the 

    required direction, so as to make timely adjustment and save time. 

    But in the actual construction process, the lime line is very 

    likely to be covered by the earth so that it doesn't play a role, 

    so to speak, the question is, how do you dig the trench without 

    a lime line?



    How do you dig the trench without a lime line?


    As the saying goes, there is no problem that can't be solved, but 

    there is no way to solve the problem! Spoke of lime in front of 

    the line is a reference, since lime line can't see that we have 

    to find something else to do reference, it can be a roadside 

    kerbstone, also can be the basis of building, but can't find around 

    there is no suitable reference, experienced driver excavator crawler 

    plate will be as a reference, the little black is also very agree 

    with this approach and tried. Adjusting excavator about alignment, 

    the edge of the segments as reference, after digging a visual 

    groove is straight out of the car, if not flat again, adjust 

    the excavator to the appropriate location, the excavator walking 

    direction deviation, also don't have as much as possible to keep 

    certain actions, one pace reachs the designated position as far 

    as possible.


    How do you dig the trench without a lime line?

    Believe many JiaYou wondering, I'm not straight groove dig is 

    bent, but the little black here said the "bend" is not bad, 

    but a certain radian turn, need to use bucket bucket teeth or 

    edge with the corresponding action to "carve".








    2. How to draw the bottom of the ditch?


    1. Use measurement tools


    Under the direction of the construction personnel, the measuring tool 

    can control the depth and the channel slope more accurately, which 

    is more the cooperation between the driver and the engineer.



    2. Built-in tools

    In some time ago, a warm-hearted JiaYou gives us his invention, his 

    name is Han Hai, and applied for a patent for this, often around 

    real JiaYou should be familiar with this name will be, this is 

    accused of "technology" one of the biggest benefits, free time 

    can take a closer look at him to write this article, learn about 

    his ideas. This is also a way to control the depth of the groove 

    when digging ditches, "alone" can "play", this tool looks complicated, 

    it doesn't matter, to a complex, is directly with a tape measure 

    in the body, the driver next time see can at any time. It may not be 

    a tape measure, but it might just be a suitable length of tree branch.




    3. The bucket draws the bottom of the ditch



    Here after dug trenches, can use the bucket will channel groove end 

    flat, the majority of the builder to the requirement of trenching also 

    is such, especially in the groove, need to install the pipe groove 

    flat after can then proceed to the next step.


     
    Links
    江蘇工兵機(jī)械裝備有限公司受ZFB商標(biāo)所有人:工兵機(jī)械(韓國(guó))有限公司授權(quán)使用GBPSC,是一家制造,進(jìn)口,銷售,維修,服務(wù),信息管理于一體具備現(xiàn)代化經(jīng)營(yíng)管理模式的制造型企業(yè).
    產(chǎn)品保修
    防偽查詢
    請(qǐng)關(guān)注公眾號(hào)
    GBPSC999
    連港工兵
    官方小程序
    15996119999